Rabu, 13 Agustus 2014

BAB. V. Sumber Daya Energi POM & Besaran-Besaran Praktis (bag.1)


BAB. V. Sumber Daya Energi POM & Besaran-Besaran Praktis

5.01, Analisis Neraca Panas & Daya Listrik Palm Oil Mill.


Basis  : Kapasitas Pabrik 30 ton TBS / jam.
Produk samping yang dimanfaatkan sebagai bahan bakar ;
1.    Serabut  ( Fiber  ).
2.    Cangkang  ( shell )
3.    Tandan kosong  ( empty bunch ) -à cadangan.

Analisa ketersediaan bahan bakar ( fuel)

  1. Serabut  ( Fibre )
Quantity = 17,5 % x TBS (wet) = 5250 kg / jam ( referensi Material balance)
Komposisi:
                H2O    =   23,7 %
                NOS    =   70,8 %
                Oil       =    5,5 %
                -----------------------
                Total   =   100 %

  1. Cangkang ( Shell ).
Quantity = 7,5 % x TBS ( wet ) = 2250 kg/jam ( referensi material balance )
Komposisi :
               H2O     =   16 %
               NOS     =   83 %
               Oil        =   1  %
              ------------------------
              Total     = 100 %

Heating value of fuel :
Referensi  : Stork Palm oil Review vol.2 No, 2 March 1961.
Heating value  : heat produced at constant volume by complete combustion of a unit quantity of fuel in an oxygen  bomb calorimeter.
High heating value  ( HHV ) : heating value which  include the latent heat or gross heating value ( GHV )  of vaporization of water in the combustion product.
Low Heating Value  ( LHV )  : heating value which is not include the latent heat of vaporization  of water in the combustion product.

LHV serabut ( fibre)
=  ( 44,5 x NOS%) + ( 49,5 x oil% ) – 600 kCal/kg
    =  ( 44,5 x 70,8 ) + ( 49,5 x 5,4 ) – 600 kCal/kg
    =  2817,9 kCal/kg.



 LHV Cangkang ( shell )
= ( 53 x NOS% ) + ( 41 x Oil% ) 600 kCal/kg
= ( 53 x 83 ) + ( 41 x 1 ) – 600 kCal/kg
= 3840 kCal/kg.

Total Heat available  ( Q production )  = Q serabut + Q cangkang.
         = (total serabut x  LHV serabut ) + ( Total cangkang x  LHV cangkang)
         = ( 5250 kg/jamx 2817,9 kCal/kg) + (2250 kg/jam x 3840 kCal/kg)
         = 23.433.975  Kcal/jam.



Analisa Konsumsi Bahan Bakar;

User ( pemakai ) utama bahan bakar  : Steam Boiler.
Properties steam :
1.  Quality                   :  Superheated Steam
2.  Quantity,M    :  25.000 kg / jam  ( Kapasitas Boiler)
3.  Tekanan,P     :  21 kg/cm2G ( Project specification)
4.  Temperature : 270  C
5.  Enthalpi,Hv   :  2950,93 kJ/kg  = 705 kCal/kg.

Properties Air Umpan Boiler ( Boiler Feed Water)
1. Tekanan  : 21 kg/cm2G ( Project specification
     2.  Temperature :  70  C
3.  Enthalpi, Hl   :  294,7 kJ/kg = 70 kCal/kg.

Boiler efficiency ( n ) :  75 % ( vendor  data )

Total kebutuhan panas Boiler( Q consumption ) :

Q consumption                  
=  ( M x ( Hv – Hl) /n
=  25.000 x ( 705 – 70 ) / 0.75
=  21.166.666 kCal/jam

Neraca Panas Total                    
=  Q production  -  Q consumption
=  23.433.975  -  21.166.666  k Cal/jam
=    2.267.309  kCal/jam  ( excess )

  1. Analisa Ketersediaan Tenaga Listrik ( Electric Power ).

Main Power Generator :  Steam Turbo Alternator.
Type   : Single Stage , non condensing.

Direct High Pressure  Steam comsumption for
Steam Driven pump                    :  900 kg / jam.
Steam Losses ( 2% )                   :  500 kg / jam

Actual available steam ( Ma)       
= 25.000 – 900 – 500  kg / jam
= 23.600 kg/jam
Actual steam consumption rate  ( St )  =  24 kg / kWh

Total Electric power available ( P )
=  Ma / St 
= 23.600 kg/jam / 24 kg/ kWh.
=  983 kW



  1. Analisa Konsumsi     Energy Listrik :

Power consumption at peak load  = 19 kWh / ton TBS x  30  ton TBS/jam   = 570 kW

Total Power Balance    
=  983 kw – 570 kW =  413 kW ( Excess )



1.   Kekuatan terbesar dalam diri kita adalah kemampuan memilih pikiran       ( yang positif ).

2.   Kemampuan memilih tindakan hanya akan menghasilkan kesuksesan.

3.   Kemampuan memilih pikiran akan menghasilkan kebahagiaan.

4.   Manusia diciptakan  Tuhan didunia untuk mencapai kebahagiaan.

5.   Dalam bertindak hendaklah perasaan dikontrol oleh pikiran.

6.   Keberhasilan kita akan sesuatu karena dipikirkan   berulang ulang.





1.02.KOREKSI FAKTOR DAYA ( COS phi ).


Kapasitor bank dibutuhkan  :

Daya terpakai  = 900 KW

Power factor awal = 0,65  =è 
 KVA  =1384,6 => KVAR =  1052,2

Power factor koreksi = 0,9 =>  
 KVA = 1000   =>  KVAR =    435,9
-----------------------------------------------
 KVAR dibutuhkan             =    616,3

                         2                2              2
           (KVAR)  =  (KVA)   -  (KW)




1.03. Pemakaian Bahan Bakar / bahan untuk pembangkit listrik /uap                                                                                                                

 

No
Mesi /alat
Bhn bakar/bhn
Satuan
Jumlah
1
Diesel
Solar
Liter / kwh
0,16
2
Turbin
Steam
Kg / kwh
24
3
Boiler
Fiber & shell
Kg / kwh
0,4


















1.04. NILAI KALOR                                                                                                                        



      Material


      Cal / kg

Cangkang LHV

 Serabut  LHV

Tandan Kosong

Kernel

Minyak sawit

Minyak solar

Minyak Premium

Kayu rambung

Elpiji


       3840

       2818

2.000 – 2.500





10.500

10.200

2.400 – 3.700

9.800

 


Tidak ada komentar: